Water Heater Services
Storage Water Heater Replacement in Singapore
Storage water heater replacement starts from $220 in labour at SG QuickFix, with the heater charged separately. The old tank is switched off, drained and removed, and the new tank is mounted in the same position, connected and tested, usually in two to three hours. A heater that is leaking or damaged should not be used until it is replaced.
Ask about this task Back to all water heater services tasks
Listed price
From $220
Task guide
When this may be needed
- The tank is leaking from its body.
- The water takes much longer to heat than before.
- The heater trips the power.
- Rusty water comes from the hot taps.
- The heater is old and you want a 5-tick model.
What the team does
The technician switches off the heater at its double pole switch, isolates the cold supply and drains the tank, which takes time on a large tank. The old tank is disconnected and taken down. The new tank is mounted on secure brackets, connected with its pressure relief valve, and filled completely before power is switched on. Every hot water point is then tested and the connections checked for leaks.
Included in this price
- Switching off, isolating and draining the old tank
- Removing the old tank
- Mounting and connecting the new tank with its relief valve
- Filling before power-on and testing
Limits & price factors
The heater is not included unless agreed. New pipe runs, new electrical points, ceiling openings and disposal of the old tank may be charged separately.
The labour price starts from $220. Tanks in ceiling spaces, a new tank of a different size and corroded connections take longer.
FAQs
At SG QuickFix, storage heater replacement labour starts from $220, plus the heater.
Switch it off at its double pole switch and close the water supply to it. The Consumer Product Safety Office advises not using a heater that is leaking or damaged.
The tank's inside may be corroding. That usually means it is nearing the end of its life.
About two to three hours, mostly for draining, mounting the new tank and refilling.