Quick answer
HDB rewiring cost in Singapore depends on your point count (each light, socket, heater and aircon circuit) plus the DB box, trunking and testing, more than on flat size. An EMA licensed electrical worker must do it. SG QuickFix quotes full rewiring after a site survey; a new DB box costs from $450.
SG QuickFix pricesTap to WhatsApp
| Full rewiring | Site Survey + Quote |
| RCCB / RCD replacement | From $180 |
| DB rewire | From $300 |
| Full distribution board replacement | From $450 |
Current SG QuickFix starting prices. Final price confirmed before work begins.
Need it fixed? WhatsApp us a photo and we'll confirm the price before we come.
WhatsApp us
How much does it cost to rewire an HDB flat?
A full HDB rewire is priced per point plus the DB box, trunking and testing, so your point count matters more than flat size.
A point is one light, one socket, or one dedicated circuit for a water heater, aircon or cooker. Each type is priced differently because a heater or aircon circuit needs thicker cable and its own breaker. Quotes for the same 4-room flat can differ three- or four-fold, mostly because they count different points, trunking routes and extras.
SG QuickFix prices a full rewire after a site survey, because the point count and cable routes decide the cost. The related jobs below are priced on their own, not as per-point rates inside a full rewire; see all circuit breaker and DB box services.
| Job | What it covers | SG QuickFix price |
|---|---|---|
| Full rewiring | New circuits, points and DB box for the whole flat | Site survey, then a quote |
| DB rewire | Rewiring inside the DB box; room wiring stays | From $300 |
| Full distribution board replacement | A new DB box | From $450 |
| RCCB / RCD replacement | Replacing the 30 mA RCCB (earth-leakage protection) | From $180 |
| New surface-mounted power point | One extra socket on its own, run in trunking | From $120 |
| New light point installation | One extra light point on its own | From $120 |
| 20A power point | Usually an aircon point (HDB permit in 30A flats) | From $160 |
A DB rewire is not a whole-flat rewire: it tidies and re-terminates the box, but the cables to your rooms stay. Only a full rewire replaces them.
What's included in a full HDB rewire?
A full rewire replaces every circuit from the DB box to each switch and socket, and usually the DB box itself.
A complete quote normally covers:
- New cables for lighting and 13A socket circuits, and dedicated circuits for each water heater, aircon system and cooker.
- New switches, sockets and ceiling points.
- A new DB box with a main switch, a 30 mA RCCB and one breaker per circuit, labelled.
- PVC trunking or conduit, and removal of the old wiring.
- The licensed electrical worker's testing and certification, and the HDB-endorsed Form CS/5H submission to SP Services (part of SP Group).
Light fittings, fans, hacking, patching, painting, false ceilings, carpentry and data points are usually extra. Ask for each one in writing.
The RCCB isn't optional. Every home must have an RCCB or a working ELCB, and since 1 Jul 2023 the Energy Market Authority (EMA) requires 30 mA RCCB protection on a home's socket and lighting circuits (EMA: 30 mA RCCB circular). For the box alone, see HDB DB box replacement cost and whether an RCCB is compulsory in Singapore.
Most electricians use 1.5 mm² cable for lighting, 2.5 mm² for sockets and 4 mm² or 6 mm² for an instant heater or cooker. The licensed electrical worker sizes each circuit to Singapore Standard SS 638, the code of practice for electrical installations.

How many points does a 3-room, 4-room, 5-room or Executive flat need?
Advertised rewiring packages typically assume about 8 to 14 light points and 10 to 14 socket points, rising with flat size.
| Flat | Light points | Socket points |
|---|---|---|
| 3-room | about 8 | about 10 |
| 4-room | about 12 | about 12 |
| 5-room | about 14 | about 14 |
| Executive | above a 5-room | above a 5-room |
Most socket points in these packages are double sockets. Add one dedicated circuit per water heater, aircon system and cooker.
Count your own points before asking for quotes: walk each room and note every light, socket, heater and aircon unit you want. Ask whether a double socket counts as one point or two, because quotes differ. HDB sets no limit on the number of points, but the total is limited by your main switch rating.
For single extra points without a rewire, see power socket installation or light installation.
Can wiring be hidden inside HDB walls?
Not in new grooves. HDB doesn't allow new wiring to be embedded in walls, columns, beams, slabs or plaster, even inside conduit.
HDB's rule is "no embedding of wiring (housed in metal/ high impact PVC conduit)" in structural elements, wall plaster or other finishes (HDB: Electrical works). Unauthorised works must be removed, made good or reinstated. Be wary of any quote offering to chase grooves into walls.
That leaves surface or concealed routes. PVC trunking or surface conduit is the cheapest and needs no HDB permit. Concealed runs hide the cable inside a false ceiling, boxing or carpentry, which looks neater but costs more.
In some flats, an electrician may be able to pull new cable through the original hidden conduits. Ask whether a quote assumes this, and what happens if a conduit is blocked.
Do I need an HDB permit to rewire my flat?
No. HDB lists rewiring, extra light and 13A points, and PVC trunking as works that need no permit, subject to its guidelines (HDB: Electrical works).
The main exception: in flats without higher electrical loading (a 30A main switch), new 15A points and 20A isolators need an HDB permit. Flats with a 40A main switch, or upgraded under the Main Upgrading Programme (MUP) or Home Improvement Programme (HIP), don't. HDB allows a 20A isolator only for an air-conditioner, and appliances above 15A aren't allowed. Items not listed in HDB's guidelines also need its approval.
In 30A flats, HDB also limits an instant water heater, oven, cooker or washer with heater to 3 kW each, and a storage heater to 1.5 kW.
Two more HDB rules shape the plan. Power points aren't allowed in bathrooms. Contractors may work 9am to 6pm on weekdays and Saturdays; noisy work (hacking, heavy drilling, tile cutting) 9am to 5pm on weekdays only; never on Sundays, public holidays or the eves of New Year's Day, Chinese New Year, Deepavali, Hari Raya Puasa and Christmas.
Who must do the rewiring, and how is it tested?
An EMA licensed electrical worker (LEW) must do or supervise the work, test and certify it, and apply to SP Services for inspection before use.
Under section 82 of the Electricity Act, only an LEW, or someone working under one, may do electrical work, and knowingly engaging an unlicensed person is an offence (Electricity Act, s82). EMA says the LEW's work "includes any rewiring" and that the LEW certifies the installation is safe before power is turned on (Ask.gov.sg: EMA).
HDB says that after testing, the LEW submits SP Services form CS/5H endorsed by HDB. SP Services, part of SP Group, must accept the inspection application before the new wiring is used, and it spot-checks selected jobs on site. The first inspection is free; if one fails, a re-inspection fee is payable.
What pushes a rewiring quote up, and how do I compare quotes?
More points, dedicated heater and aircon circuits, concealed runs and making good raise the price. Compare quotes line by line, not by total.
The main cost drivers:
- More points, especially extra aircon, heater and cooker circuits.
- Concealed runs in false ceilings or carpentry.
- Dismantling old wiring, then patching and painting.
- Moving the DB box.
- A permit case: new 15A points or an aircon isolator in a 30A flat.
When you compare quotes, check each one lists:
- Points by type and count, and the price of each extra point.
- Cable size for each circuit.
- The route: trunking, conduit or concealed.
- The DB box, its number of ways, and the 30 mA RCCB.
- Removal of old wiring and making good.
- The LEW's name, certification, and the Form CS/5H submission to SP Services.
For an accurate price, send your floor plan, a photo of the DB box with its door closed, and a list of points to add or remove. If you're unsure it's needed at all, read whether your resale HDB flat needs rewiring. For other jobs, see the full electrician price list for Singapore.

| Safe to DIY if… | Call a professional if… |
|---|---|
| You're counting points and marking where you want new ones | Any rewiring, new circuit or DB change. Never DIY: a licensed electrical worker, by law |
| You're checking each quote lists points, cable sizes and the LEW | Cables would be run, circuits extended or walls hacked: never DIY |
| You're pressing the RCCB's "T" button to test it | The RCCB doesn't trip when tested, or the DB box is warm, buzzing or scorched |
| You're reading your main switch rating (30A or 40A) on the DB box | You want a 15A point or aircon isolator in a 30A flat (HDB permit), or your wiring is near HDB's 25-year cable life |
What happens when you WhatsApp us?
- 1WhatsApp us a photo or short video of the problem.
- 2We confirm the price before we come.
- 3A technician arrives at the agreed time.
- 4The job is done and you pay only the confirmed price.
Circuit Breaker / DB Services
Site Survey + Quote
- DB board inspection
- RCCB / MCB replacement
Circuit Breaker / DB Services FAQs
HDB doesn't require a full rewire at a set age. It puts the life of PVC cable at about 25 years and advises replacing wiring that is past that age or has deteriorated. What is compulsory is an RCCB or a working ELCB, a rule since 1 Jul 2023.
A 4-room HDB rewire run in trunking typically takes 3 to 5 working days, longer alongside renovation, false ceilings or carpentry. You can usually stay: circuits are switched off during working hours and restored in the evening, with the whole flat off while the DB box is changed and tested.
Yes, a partial rewire is possible. Each new or modified portion of wiring must go through the licensed electrical worker's application to SP Services for inspection before it is used. The new circuits usually still run from your existing DB box, so check that the box and its RCCB are sound.
For HDB flats, SP Group's handbook says the first inspection of new or modified wiring by SP Services is free. If the installation fails, a re-inspection fee is payable. Ask whether your rewiring quote covers the licensed electrical worker's submission and any re-inspection if something has to be corrected.
Usually, but not always, so check the quote line by line. A full rewire normally ends at a new DB box with a main switch, a 30 mA RCCB and one breaker per circuit. At SG QuickFix, a full distribution board replacement costs from $450.
Yes. HDB allows a 20A isolator only for an air-conditioner. In flats without higher electrical loading (a 30A main switch), new 15A points and 20A isolators need an HDB permit; flats with a 40A main switch, or upgraded under HDB's upgrading programmes (MUP or HIP), don't.
Ask for the licensed electrical worker's name and licence number before work starts, and check that the quote names who certifies and submits the wiring. Under Singapore's Electricity Act, knowingly engaging an unlicensed person to do electrical work is an offence.
Related services
Circuit Breaker / DB Services
Site Survey + Quote
View servicePower Socket Installation & Repair
From $70
View serviceLighting Installation & Repair
From $60
View serviceServing Bedok, Pasir Ris, Punggol, Sengkang and Tampines and island-wide.
Sources & updates
- HDB: Renovation guidelines, electrical works, checked 1 Oct 2026
- HDB: Home care guide, electrical accessories and wiring, checked 1 Oct 2026
- Singapore Statutes Online: Electricity Act 2001, section 82, checked 1 Oct 2026
- EMA on Ask.gov.sg: Electrical works must be carried out by licensed electrical workers, checked 1 Oct 2026
- SP Group: How to apply for electricity connection (Jan 2026), checked 1 Oct 2026
- EMA: Circular RD/E01/2023 on RCCBs in residential premises (May 2023, PDF), checked 1 Oct 2026
- HDB: Residual current circuit breakers required in all homes (11 May 2023), checked 1 Oct 2026
- Updated 1 Oct 2026: First published
Related guides

HDB DB Box Replacement Cost (2026): MCB, RCCB and Full Board
Replacing a full DB box in an HDB flat costs from $450 at SG QuickFix, while a single MCB costs from $120 and an RCCB from $180. If only one breaker is faulty, replacing that part costs less, so diagnose first. In Singapore, only a licensed electrical worker may do the work.
Updated 15 Oct 2026 · 8 min read

Ceiling Fan Not Spinning or Slow? Capacitor, Remote or Motor
In Singapore homes, a ceiling fan not spinning but humming, or slow on every speed, usually has a failed capacitor if it's an AC fan. DC fans have no run capacitor, so suspect the remote receiver or controller, especially after a power trip. Check the power and re-pair the remote first. SG QuickFix diagnoses a non-working fan from $80.
Updated 4 Nov 2026 · 7 min read

Ceiling Fan Wobbling: What's Normal and When It's Dangerous
A wobbling ceiling fan can be dangerous. A faint, steady sway that isn't growing is usually blade imbalance, but Singapore's Consumer Product Safety Office says to stop using a fan that starts to wobble or makes loud noises. Switch it off and have the blades, canopy and hook checked. SG QuickFix balances and diagnoses wobbling fans from $80.
Updated 3 Nov 2026 · 7 min read
Still need help with circuit breaker / db services?
WhatsApp us a photo and get a clear price before we come. Open 24 hours, island-wide.
This guide is general information for homes in Singapore. It is not professional, legal or safety advice for your specific situation. Electrical, gas and some plumbing work can be dangerous, and Singapore law requires certain jobs to be done by licensed workers. Any work you carry out yourself is at your own risk, and SG QuickFix accepts no responsibility for any loss, damage or injury arising from the use of this information. Prices shown are current starting prices, may change, and the final price is confirmed before any work begins. Rules and figures from HDB, PUB, EMA, SP Group and town councils were correct when last checked; please confirm with the relevant authority before acting.
