Replacing a full DB box in an HDB flat costs from $450 at SG QuickFix, while a single MCB costs from $120 and an RCCB from $180. If only one breaker is faulty, replacing that part costs less, so diagnose first. In Singapore, only a licensed electrical worker may do the work.
SG QuickFix pricesTap to WhatsApp
| Full distribution board replacement | From $450 |
| Distribution board troubleshooting | From $100 |
| MCB replacement | From $120 |
| RCBO replacement | From $150 |
| RCCB / RCD replacement | From $180 |
| DB rewire | From $300 |
Current SG QuickFix starting prices. Final price confirmed before work begins.
Need it fixed? WhatsApp us a photo and we'll confirm the price before we come.
WhatsApp us
How much does it cost to replace a DB box in an HDB flat?
At SG QuickFix, replacing the whole DB box in an HDB flat costs from $450; changing one breaker costs less.
If only one breaker is faulty, replacing that part fixes it. The table shows each job and when it applies.
| Job | When it applies | Price |
|---|---|---|
| Distribution board troubleshooting | You're not sure what's wrong, or a breaker keeps tripping | From $100 |
| MCB replacement | One circuit's breaker won't reset, feels hot or is scorched | From $120 |
| RCBO replacement | A combined breaker protecting one circuit has failed | From $150 |
| Minor DB rectification | Loose terminals, missing labels or a small fault inside the board | From $150 |
| RCCB / RCD replacement | The RCCB fails its test button or won't stay on | From $180 |
| DB rewire | The board's internal wiring is messy, loose or heat-damaged | From $300 |
| Full distribution board replacement | An old fuse board, several damaged parts, or no room for new circuits | From $450 |
| Full rewiring | The flat's cables are near the end of their life | Site Survey + Quote |
Each job is priced separately. See circuit breaker and DB box prices for the service details, or the full electrician price list for Singapore for other electrical work.
For an accurate price, send a photo of the DB box with its door open, showing every breaker and label, and say what's wrong.
What's inside an HDB DB box?
An HDB DB box usually holds a main switch, a residual current circuit breaker (RCCB), and one miniature circuit breaker (MCB) per circuit.
HDB's home care guide calls it a consumer unit. Each part has its own job:
- The main switch caps the current the whole flat can draw: HDB says 40A in blocks completed from 1 Jan 1994 or upgraded under the Main Upgrading Programme or Home Improvement Programme, and 30A in others.
- Each MCB protects one circuit, such as the lights, sockets, aircon or water heater, and trips on overload or a short circuit.
- The RCCB trips on earth leakage: current escaping to earth, often through damaged insulation or a faulty appliance.
Older flats can differ. EMA and HDB say RCCBs have been required in new installations since July 1985, and earlier homes were given fuses. So an unrenovated older flat may still have rewireable fuses or an older ELCB instead.
The electricity meter sits outside your flat, and the DB box inside it. Everything from the DB box into the flat is generally the owner's to maintain.

Do you need one new breaker or a whole new board?
Replace one part when one breaker is faulty; replace the whole board when damage, age or missing protection affects several parts.
| What you notice | Likely job |
|---|---|
| One breaker won't reset, or trips with nothing running on its circuit | Diagnosis first, then MCB replacement if the breaker itself is faulty |
| Pressing the RCCB's T button doesn't switch it off | RCCB replacement: HDB says it may be defective |
| The RCCB trips even with every MCB switched off | Diagnosis; often the RCCB itself |
| Heat, a burning smell or scorch marks on one breaker | Diagnosis, then MCB replacement or minor DB rectification |
| Scorching across several breakers or the metal bar joining them | Full board replacement |
| Rewireable fuses, or no RCCB or ELCB at all | Full board replacement; if there's no RCCB or ELCB, call HDB on 6225 5432 first |
| No spare slots for new circuits in a renovation | Full board replacement |
Diagnose before you replace. A breaker that keeps tripping is usually doing its job: the fault is often an appliance or a damaged circuit, and a new breaker would trip too. Power trip diagnosis costs from $80, and a separate guide explains why power keeps tripping.
What usually fails first is a loose terminal on a heavy-load circuit, such as the water heater, aircon or oven, which heats up and scorches the breaker.
Age alone isn't a reason to replace a board. But HDB puts PVC cable life at about 25 years, so an older flat's original board and wiring are worth an inspection. A separate guide covers whether your resale HDB flat needs rewiring.
What makes a DB box replacement cost more?
The number of circuits, the type and brand of breakers, and the state of the wiring behind the board set the final price.
- Number of circuits: more circuits need a bigger board and more breakers.
- RCBOs instead of one RCCB plus MCBs: each costs more, but a leak cuts only its own circuit.
- Brand and enclosure: premium breakers, or a new box to fit the wall recess.
- Wiring behind the board: loose, undersized or heat-damaged cables found on opening need rectifying.
Flat size matters less than the number of circuits. Ask whether the quote includes the new breakers and enclosure, and which brand. Rewiring circuits, adding circuits and moving the board are separate jobs, each priced separately. If the wiring itself is past its life, a separate guide covers HDB rewiring cost.
A single breaker swap typically takes under an hour. A like-for-like full board usually takes 2 to 4 hours with the whole flat's power off, so plan for no fridge, Wi-Fi or aircon.
Who can replace a DB box, and do you need an HDB permit?
Only a licensed electrical worker (LEW) may replace a DB box or any breaker in it; HDB needs no permit for this work.
Under section 82 of the Electricity Act, no one may carry out electrical work unless they are an LEW or supervised by one. The Act says it is not unlawful to replace a lamp or a household-type fuse in your own installation, and EMA says rewiring, repair and replacement works must be done by a licensed electrical worker. An owner must not knowingly engage an unlicensed person; that is also an offence.
HDB's electrical works guidelines list altering or adding an RCCB, ELCB, MCB, socket outlet or main switch as work that needs no permit, subject to HDB's guidelines. A permit is needed for a new 15A point or a 20A isolator in a flat without higher electrical loading. For new circuits or rewiring, your LEW submits HDB-endorsed Form CS/5H to SP Services (part of SP Group) for testing. Work outside HDB's guidelines, such as moving the board, should be checked with HDB first.
When comparing quotes, ask who the LEW is and whether SP Services testing is covered.
Will HDB's RCCB subsidy pay for a new DB box or RCCB?
Not for a replacement: EMA says repairing or replacing an RCCB isn't eligible for HDB's subsidised installation (EMA on Ask Gov).
HDB's RCCB Installation Assistance Programme was for sold flats completed in or before 1985 with no RCCB. If your flat has neither an RCCB nor an ELCB, call the HDB Branch Service Line on 6225 5432 before paying for a new board. The Energy Market Authority (EMA) says homes with neither can be fined up to $5,000 from 1 Jul 2025 (EMA on Ask Gov: RCCB requirement). A faulty RCCB isn't penalised, but an LEW should replace it. A separate guide covers whether an RCCB is compulsory in Singapore.
Can you do any of it yourself?
You can test the RCCB, reset a breaker once and take photos; changing any breaker or the board is licensed work.
Two shortcuts are common and dangerous. Fitting a bigger MCB to stop trips leaves the cable unprotected, so it can overheat. Bypassing an RCCB that keeps tripping removes your protection against electric shock.
| Safe to DIY if… | Call a professional if… |
|---|---|
| You're pressing the RCCB's T button once a month to test it | The RCCB doesn't switch off when you press T: a licensed electrical worker replaces it |
| A breaker tripped once and you unplugged that circuit's appliances before resetting it | A breaker trips again straight after a reset: get the circuit diagnosed, never fit a bigger breaker |
| You're photographing the board and noting which circuit fails | You notice heat, a burning smell or scorch marks: don't touch the DB box; call an LEW, or 995 if there's smoke or fire |
| You're checking whether your flat has an RCCB or an ELCB | The flat has only fuses, or neither an RCCB nor an ELCB: call HDB on 6225 5432, then a licensed electrical worker |
| You're labelling which breaker controls which room | You want to swap an MCB, RCCB or the whole board yourself: don't, it's illegal and the incoming side stays live |

What happens when you WhatsApp us?
- 1WhatsApp us a photo or short video of the problem.
- 2We confirm the price before we come.
- 3A technician arrives at the agreed time.
- 4The job is done and you pay only the confirmed price.
Circuit Breaker / DB Services
From $450
- DB board inspection
- RCCB / MCB replacement
Circuit Breaker / DB Services FAQs
At SG QuickFix, a full distribution board replacement costs from $450. For a 4-room HDB flat, the final price depends more on the number of circuits than the number of rooms, plus the breaker brand, whether you choose RCBOs, and whether the wiring behind the board needs rectifying.
No. Singapore's Electricity Act says it is not unlawful to replace a lamp or a household-type fuse in your own installation, but EMA says rewiring, repair and replacement works must be done by a licensed electrical worker. So an MCB, RCCB or DB box swap is LEW work, and owners must not knowingly hire an unlicensed person either.
No, not if it works. EMA says a working ELCB (earth leakage circuit breaker) doesn't need to be replaced with an RCCB, because Singapore homes need either one. A faulty ELCB should be repaired or replaced by a licensed electrical worker; a replacement is usually a 30 mA RCCB.
Not for a replacement. EMA says repairing or replacing an RCCB isn't eligible for HDB's subsidised installation, so the owner pays for a new DB box. If your HDB flat has neither an RCCB nor an ELCB, call the HDB Branch Service Line on 6225 5432 first: its assistance programme covered flats completed in or before 1985.
Either setup is acceptable if every socket and lighting circuit has 30 mA earth-leakage protection. An RCBO combines an MCB and an RCCB for one circuit, so a leak cuts only that circuit instead of the whole flat. RCBOs cost more per circuit; SG QuickFix replaces one from $150.
No. A new DB box doesn't raise your flat's electrical loading. HDB says the flat's maximum current is limited by the rating of the main switch, which is 40A in blocks completed from 1994 or upgraded under MUP or HIP, and 30A in others. Ask a licensed electrical worker before adding aircon circuits.
Not automatically. A licensed electrical worker tests the circuits when the new board goes in. A new 30 mA RCCB can expose leakage in old, damaged insulation, and HDB puts PVC cable life at about 25 years, so older flats sometimes need a DB rewire or full rewiring as well.
Related services
Circuit Breaker / DB Services
From $450
View serviceElectrical Troubleshooting / Power Trip
From $80
View serviceServing Bedok, Pasir Ris, Punggol, Sengkang and Tampines and island-wide.
Sources & updates
- Singapore Statutes Online: Electricity Act 2001, section 82, checked 1 Oct 2026
- HDB: Renovation guidelines, electrical works, checked 1 Oct 2026
- HDB: Home care guide, electrical accessories and wiring, checked 1 Oct 2026
- EMA and HDB: RCCBs required in all residential premises built before 1985 (media release, 12 May 2023, PDF), checked 1 Oct 2026
- EMA: Circular RD/E01/2023 on RCCBs in residential premises (May 2023, PDF), checked 1 Oct 2026
- EMA on Ask.gov.sg: Is it compulsory to install an RCCB in my home?, checked 1 Oct 2026
- EMA on Ask.gov.sg: What should I do if my ELCB or RCCB is faulty?, checked 1 Oct 2026
- EMA on Ask.gov.sg: Do I need to change my ELCB to an RCCB?, checked 1 Oct 2026
- Updated 1 Oct 2026: First published
Related guides

Power Keeps Tripping? MCB vs RCCB and How to Find the Cause
When power keeps tripping in a Singapore home, a DB box switch is cutting off a fault: an MCB trips on overload or short circuit, the RCCB on earth leakage. With dry hands, switch all MCBs off, reset, then turn them on one by one and leave off the one that trips. SG QuickFix diagnoses power trips from $80.
Updated 12 Oct 2026 · 7 min read

Ceiling Fan Installation Cost Singapore (2026): Swap, New Point
Ceiling fan installation in Singapore costs from $90 at SG QuickFix to swap an old fan, and from $100 for a new fan on an existing fan point. With no fan point, add a new electrical point, priced from $150 additional. HDB caps fans at 6 kg. The fan is bought separately.
Updated 9 Oct 2026 · 8 min read

Power Trip During a Thunderstorm: Normal or a Fault?
An occasional power trip during a thunderstorm in Singapore is usually normal: lightning causes a brief leak the RCCB treats as a fault. Wait until the lightning passes, unplug electronics and reset once. If it trips every time it rains, water is reaching a socket, light or cable in your HDB flat. SG QuickFix diagnoses power trips from $80.
Updated 8 Oct 2026 · 6 min read
Still need help with circuit breaker / db services?
WhatsApp us a photo and get a clear price before we come. Open 24 hours, island-wide.
This guide is general information for homes in Singapore. It is not professional, legal or safety advice for your specific situation. Electrical, gas and some plumbing work can be dangerous, and Singapore law requires certain jobs to be done by licensed workers. Any work you carry out yourself is at your own risk, and SG QuickFix accepts no responsibility for any loss, damage or injury arising from the use of this information. Prices shown are current starting prices, may change, and the final price is confirmed before any work begins. Rules and figures from HDB, PUB, EMA, SP Group and town councils were correct when last checked; please confirm with the relevant authority before acting.