Shower Plumbing
Shower Mixer Replacement in Singapore
Shower mixer replacement starts from $100 in labour at SG QuickFix, with the new mixer charged separately. An exposed wall mixer that drips, has a stiff handle or gives uneven temperatures is replaced on the existing wall connectors, usually in one to one and a half hours. PUB lists replacing a mixer as simple plumbing work.
Ask about this task Back to all shower plumbing tasks
Listed price
From $100
+ mixer
Task guide
When this may be needed
- The mixer drips constantly and new cartridges haven't helped.
- The handle is stiff or loose.
- The water swings between hot and cold.
- The chrome has corroded.
- You are upgrading to a thermostatic mixer.
What the team does
The technician isolates the hot and cold supplies, removes the old mixer and checks the wall connectors' spacing and condition. Connectors are cleaned and resealed, the new mixer is fitted level with its washers, and the hot and cold sides are confirmed correct. The mixer is tested on hot, cold and mixed, and every connection checked for leaks.
Included in this price
- Isolating hot and cold supplies
- Removing the old mixer and checking connectors
- Fitting the new mixer level
- Testing temperatures and leak-testing
Limits & price factors
The mixer is charged on top of labour. Concealed mixers inside the wall, moving pipe positions and water heater faults are not included.
The labour price starts from $100. Connectors that need adapting, corroded connections and thermostatic mixers take longer.
FAQs
Often, by replacing the cartridge or washer. Replacement makes sense when the body is corroded or parts aren't available.
Most exposed mixers use a standard spacing with adjustable connectors. Check the new mixer's specifications against your current one.
Some mixers aren't designed for use with instant heaters. Check the mixer's compatibility before buying.
At SG QuickFix, shower mixer replacement starts from $100, plus the mixer.
